Ferro Alloys

Ferro Alloys

Overview
Prithvi Ferro Alloys Private Limited (PFAPL)

It was incorporated in January, 2008. PFAPL is operating a Ferro Alloy manufacturing unit consisting of two 9 MVA Submerged Arc Furnaces along with one 18 MW Captive Power Plant (CPP). The commercial operation of the Ferro Alloy plant (1st Furnace) started from July, 2014 and the 2nd Furnace from November 2014. The total production capacity will be 15,000 MT of Ferro Silicon on an annual basis.

PFAPL produces different grades of Ferro Silicon which is used in steel & stainless steel industry. One of the major achievements of company is that within a very short span of time, the company has successfully produced 75-grade Ferro Silicon, thereby becoming the only company in India producing this grade of Ferro Silicon. We have a regular customer base from contries like South America and Europe due to consistent quality production and service as per international standards.

The projected turnover of the company in its first full year of operation will be over Rs. 100 crore. The no of employees is around 250.

ferro-pic
18 MW Captive Power Plant

Jiangxi Jianglian Energy and Envionment Co. Ltd., Nanchang, Jiangxi, People's Republic of China have manufactured the boiler. It's a CFBC (Circulating Fluidized Bed Combustion) Boiler.

Turbine is multiple bleed, water-cooled condenser turbine from Qingdao Jieneng Steam Turbine Co. Ltd., Qingdao, People's Republic of China.

Balance of Plant has been procured from reputed vendors like BevconWayors, Sulzer, Schneider electric, Mecgale Pneumatics, Paharpur Cooling Towers, ABB, Thermax Ltd, Emerson etc.

ferro-pic3
Ferro Alloy Plant

2*9 MVA submerged arc furnace capable to produce any Ferro Alloy namely Ferro Silicon, Silico Manganese, Ferro Manganese and Ferro Chrome.

The plant has been designed on basic submerged arc technology.

Major equipments are purchased from most reputed suppliers like Paltech, Transformers and Rectifiers India, ABB, Morakhia Copper, Kleen Air, Multi Weigh, Unicon etc.

ferro-pic4
Other Facilities
  1. 65 acres of industrial land in MUL, MIDC
  2. 132 kV substation for transmission of power from CPP to nearest grid
  3. 22 km long water pipeline drawing water from Wainganga river
  4. Total number workforce : 200
  5. In house weigh bridge, quality control laboratory and packing facilities
ferro-pic2